2.9 million square feel of cast in place elevated deck
10 tower cranes on site for the majority of the project
Over 850 men and women worked on site daily during the peak of construction
All workers on site were OSHA 10-hour trained
The project was designed and built to achieve LEED Gold status with DGS contributing 23% recycled material as well as diverting 96% (or 15,000 tons) of construction waste away from landfills.
7000+ drawings available to field engineers and superintendents using PlanGrid.